TEI implemented construction activities at OCRA in 2008, which included building a flood control levee around a portion of the adjacent property. A water control structure and pump pad were also installed. Restoration earthwork included removal of levees and ditches by backfilling the levee spoil into the adjacent ditches to natural grade. Additional tasks included creation of habitat islands, installation of geoweb low-water crossings and the removal of three pump stations and associated solid waste.