TEI assisted with design and permitting, and subsequently implemented the hydrologic restoration to a more natural flow-way system of the Caloosahatchee Creek Property, owned by Lee County. Restoration entailed blocking existing drainage channels with earthen berm structures and geoweb low water crossings, as well as re-establishing hydrologic connection with the adjacent Caloosahatchee River by removing earthen berms surrounding the project area.