Turnbull Environmental, Inc. (TEI) was contracted to restore the Summer Haven River located south of Matanzas Inlet in St Johns County, Florida, which had been filled with beach sands during several storm events during 2008. The goal of the project was to re-establish the Summer Haven River to pre-2008 conditions, rebuild and plant the adjacent beach dune system, and create ten (10) acres of least tern habitat to mitigate for temporary impacts associated with the project.